a
abdullahusma306

Abdullah Usmani

@abdullahusma306
4,5(22)

Process and Layout Optimization

Pakistan
Certaines informations sont présentées en anglais.
À propos de moi
I turn inefficient production floors into high-performance operations—faster, leaner, and data-driven. As an industrial engineering manager, I lead end-to-end Lean Six Sigma transformations across manufacturing lines—eliminating waste, stabilizing processes, and building systems that actually sustain results. What I do: ▸ Build Power BI dashboards that give leadership real-time visibility into KPIs, OEE, and cost deployment ▸ Implement TPM, SMED, Kaizen, across production floors ▸ Facility layout designing and optimization ▸ Process and layout simulation design for optimal results... Plus d’infos

Compétences

a
abdullahusma306
Abdullah Usmani
10 $US/heure
hors ligne • 
Temps de réponse moyen de 8 heures

Voir mes services

hvac
I will design and improve the facility and industrial processes and layouts
4,3(13)
Formules & Macros
I will design a fully automatic dashboard in excel using vba and macros
4,6(9)

Vous souhaitez travailler sur une base horaire ?

Dites à Abdullah Usmani ce dont vous avez besoin.

10 $US

/

heure

Portfolio

Expérience professionnelle

Industrial Engineering manager

Stylewise Direct Limited • Temps plein

Nov 2021 - Present4 yrs 6 mos

Lead 10+ Lean Six Sigma (DMAIC) projects across production lines, targeting waste elimination and process variation reduction ▸ Developed Power BI and Excel dashboards adopted by senior leadership to monitor OEE, line efficiency, and cost deployment KPIs in real time ▸ Implemented SMED programs, reducing changeover time by 10% across 78 production lines, directly improving machine utilization ▸ Drove TPM and 6S rollout across departments, improving equipment reliability and reducing unplanned downtime ▸ Conducted Gemba walks and Root Cause Analysis (RCA) sessions to identify systemic losses — translating findings into sustainable countermeasures with measurable results ▸ Trained and coached 78 supervisors and 2,200 operators on Lean principles, standard work, and autonomous maintenance — building internal capability for continuous improvement ▸ Managed cross-functional improvement projects using PMP principles, ensuring on-time delivery, stakeholder alignment, and scope control ▸ Redesigned production floor layouts to enable linear workflow, reducing material travel distance and improving throughput rate ▸ Implemented 5S + Audit systems across departments, achieving sustained workplace organization standards ▸ Led process digitalization initiatives, replacing manual tracking with automated data collection tools — reducing reporting time significantly ▸ Conducted SAM/SMV calculations and line balancing studies to optimize workforce deployment and eliminate bottlenecks ▸ Executed Quick Changeover (SMED) and TPM programs to reduce downtime and improve Overall Equipment Effectiveness (OEE)

22 Avis
4,5

(17)
(3)
(1)
(1)
(0)
Détails de la notation
  • Niveau de communication avec le freelance
    4,4
  • Qualité de la livraison
    5
  • Valeur de la livraison
    4,8
1 à 5 avis sur 22
Trier par
Les plus pertinents
    E

    engstudentttiae

    Client récurrent

    SA

    Arabie Saoudite

    5

    Attention to details

    100 $US-200 $US

    Prix

    4 jours

    Durée

    gig

    hvac

    Utile?
    Oui
    Non
    E

    engstudentttiae

    Client récurrent

    SA

    Arabie Saoudite

    5

    Professionalism of work and went beyond

    Jusqu’à 50 $US

    Prix

    6 jours

    Durée

    gig

    hvac

    Utile?
    Oui
    Non
    V

    vleads

    Client récurrent

    GB

    Royaume-Uni

    5

    Great work, I loved the way you handled everything. Thank you!

    Jusqu’à 50 $US

    Prix

    1 jour

    Durée

    gig

    Formules & Macros

    Utile?
    Oui
    Non
    V

    vleads

    Client récurrent

    GB

    Royaume-Uni

    4,3

    A great job delivered. There's good communication and understanding. I will work with him again and I recommend him to anyone that needed his assistance. Thank you!

    Jusqu’à 50 $US

    Prix

    4 jours

    Durée

    gig

    Formules & Macros

    Utile?
    Oui
    Non
    N
    image-docs

    narimilani

    MT

    Malte

    5

    verry good verry good

    Jusqu’à 50 $US

    Prix

    1 jour

    Durée

    gig

    Formules & Macros

    Utile?
    Oui
    Non