a
alyzayn99

Zain.ale

@alyzayn99
4,3(4)

Estimation Engineer

Pakistan
Anglais, Espagnol, Français, Chinois
Certaines informations sont présentées en anglais.
À propos de moi
A Complete construction estimation, Quantity & Material Takeoff estimator using PlanSwift. Construction estimator and Cost Estimation specialise in Plan Swift and RSMeans, respectively, eliminating manual plan takeoffs and drastically reducing the chance of miscalculating materials or missing items. Experienced in residential and commercial construction projects and their material & Quantity Takeoff. Services cover all construction trades and all CSI divisions. It is effortless to get started with me. Send me your project drawings, and I will get back to you in 1 hour.... Plus d’infos

Compétences

a
alyzayn99
Zain.ale
hors ligne • 

Voir mes services

Estimation des quantités et estimation des coûts
I will do drywall takeoff and cost estimation by planswift
5,0(2)
Estimation des quantités et estimation des coûts
I will quantity takeoff, material takeoff, and cost estimation
3,0(1)

Portfolio

4 Avis
4,3

(3)
(0)
(1)
(0)
(0)
Détails de la notation
  • Niveau de communication avec le freelance
    4,3
  • Qualité de la livraison
    3
  • Valeur de la livraison
    3
1 à 4 avis sur 4
Trier par
Les plus pertinents
    E
    image-docs

    emmadkhan114

    PK

    Pakistan

    3

    Very responsive and cooperative. But lacked attention to detail and explaining the delivered tasks. So had to ask for explanation multiple times. Overall a hardworking guy

    Jusqu’à 50 $US

    Prix

    3 jours

    Durée

    gig

    Estimation des quantités et estimation des coûts

    Image d'échantillon de travail
    Utile?
    Oui
    Non
    K

    kiarawaren

    US

    États-Unis

    5

    The drywall takeoff was very detailed. Took me a few minutes to understand everything as it was my first take off but am satisfied. I will hire him again. Recommended!

    Jusqu’à 50 $US

    Prix

    1 jour

    Durée

    gig

    Estimation des quantités et estimation des coûts

    Utile?
    Oui
    Non
    J
    image-docs

    johnsmit1e

    US

    États-Unis

    5

    Zain responded quickly to my request to do the takeoff for my project. His takeoff was accurate and detailed. I will hire him again for my next project. Thank you, Zain for a well-done job.

    Jusqu’à 50 $US

    Prix

    1 jour

    Durée

    gig

    Estimation des quantités et estimation des coûts

    Utile?
    Oui
    Non
    A

    adambr0

    FR

    France

    5

    Le travail demandé à été fait rapidement

    Utile?
    Oui
    Non