i
iengineer_kami

Ali

@iengineer_kami
5,0(3)
Pakistan
Anglais
Certaines informations sont présentées en anglais.
À propos de moi
As an experienced industrial engineer specializing in simulation and production operations management, I bring a robust skill set in simulation tools such as Arena, Simio, and FlexSim. My expertise lies in optimizing complex systems, enhancing efficiency, and driving process improvements through detailed modeling and analysis. With a strong background in both theoretical concepts and practical applications, I am dedicated to delivering tailored solutions that meet your unique operational challenges. Whether you need to streamline workflows, reduce costs, or improve overall productivity.... Plus d’infos

Compétences

i
iengineer_kami
Ali
hors ligne • 
Temps de réponse moyen de 1 heure

Voir mes services

Gestion de projet
I will do arena simulation simio simulation and flexsim simulation
5,0(3)
Gestion de projet
I will do productions operations and operations research projects

Portfolio

3 Avis
5,0

(3)
(0)
(0)
(0)
(0)
Détails de la notation
  • Niveau de communication avec le freelance
    5
  • Qualité de la livraison
    5
  • Valeur de la livraison
    5
1 à 3 avis sur 3
Trier par
Les plus pertinents
    L
    image-docs

    limbenjamin

    SG

    Singapour

    5

    Ali was a pleasure to work with. He's professional, understanding, and proactive, readily clarifying any questions and taking the initiative to improve the design. I'm very grateful for his contributions and would gladly collaborate with him again.

    50 $US-100 $US

    Prix

    2 jours

    Durée

    gig

    Gestion de projet

    Utile?
    Oui
    Non
    M

    markanday1998

    AE

    Émirats Arabes Unis

    5

    Very good expertise in simulation softwares.

    Jusqu’à 50 $US

    Prix

    2 jours

    Durée

    gig

    Gestion de projet

    Utile?
    Oui
    Non
    A

    armghanhaideran

    US

    États-Unis

    5

    Happy with simulation work.

    Jusqu’à 50 $US

    Prix

    4 jours

    Durée

    gig

    Gestion de projet

    Utile?
    Oui
    Non