
Philipp K
Compétences

Voir mes services


Portfolio
Expérience professionnelle
Apprenticeship in Electronics
Energieprovider • Temps plein
Feb 2026 - Present • 4 mos
Project Lead – Emergency Power Supply for Critical Water Infrastructure Responsible for the end-to-end planning and coordination of a stationary emergency generator system to ensure operational continuity of a municipal water supply during extended power outages. Key responsibilities include: Conducting risk and impact analyses based on national guidelines (e.g., blackout scenarios, failure probabilities, and critical infrastructure dependencies) Defining technical requirements and sizing of the generator (e.g., kVA/kW capacity, container vs. structural solutions) Coordinating with engineering firms, construction companies, and equipment suppliers to assess site feasibility and infrastructure needs (foundation, cabling, ventilation, drainage) Managing communication with public authorities (e.g., water authorities, regulatory bodies) and aligning with funding programs and compliance requirements Preparing documentation for funding applications, including risk assessments, technical concepts, and project justifications Evaluating operational risks affecting public services (e.g., water supply, healthcare, local businesses) and translating them into infrastructure requirements
1 Avis
| (1) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Détails de la notation
- Niveau de communication avec le freelance
- Qualité de la livraison
- Valeur de la livraison
Trier par
mallorca12345
Client récurrent

Allemagne
Die Zusammenarbeit war ausgezeichnet. Philipp hat meinen Kurzbefehl schnell, präzise und genau nach meinen Vorstellungen umgesetzt, sich sehr schnell in die Thematik eingearbeitet und die ursprünglichen Anforderungen durch eigene Ideen sogar noch verbessert. Ich würde jederzeit wieder mit ihm zusammenarbeiten und kann ihn uneingeschränkt weiterempfehlen.
