I will write rams method statements and risk assessments for UK trades
UK CV and LinkedIn writer for trades and construction
À propos de ce service
Need RAMS before you can start on site? I write clear, job-specific Risk Assessments and Method Statements for UK sole traders and small contractors, in Word and PDF so you can edit them.
WHAT YOU GET
- Method statement: scope, sequence of work, people, plant, PPE
- Risk assessment with likelihood x severity scores and controls
- COSHH notes, welfare, emergency arrangements, sign-off sheet
- Written for your trade, your site and your principal contractor
ABOUT ME
I'm a UK plasterer with 20 years in construction. I hold no NEBOSH, IOSH or other H&S qualification. I use AI tools for first drafts, then personally check and tailor every section to your details.
IMPORTANT
These are templates tailored to the information you give me. You remain legally responsible for your RAMS under HSE law and CDM 2015. They are not a substitute for a site assessment by a competent person. Read, check and sign before use.
NOT COVERED: asbestos work, demolition, confined spaces, scaffold erection, structural or temporary works, electrical work.
Message me before ordering if you're unsure.
Préférence du type de livraison
Veuillez informer le freelance de toute préférence ou préoccupation concernant l'utilisation d'outils d'IA dans la réalisation et/ou la livraison de votre commande.
FAQ
Are you a qualified health & safety professional?
No. I'm a UK plasterer with 20 years in construction. I hold no NEBOSH, IOSH or other H&S qualification and I'm not a competent person for your site. I turn your information into clear, tailored RAMS for you to check.
Who is responsible for the RAMS?
You are. These are templates tailored to the information you give me. You remain legally responsible for your RAMS under HSE law and CDM 2015. They are not a substitute for a site assessment by a competent person. Read it, check it against your site and sign it before use.
Do you use AI?
Yes. AI tools help me write the first draft quickly. I then personally check every section against your details, cut anything that doesn't fit your job and tailor the wording. Nothing about your site, team or tickets is made up.
Will my principal contractor accept it?
I can't guarantee that, because every contractor has its own standards. Send me their template or requirements and I'll follow them. If they ask for changes, send me their comments and I'll update it within your revisions.
Which jobs won't you write RAMS for?
Asbestos work, demolition, confined spaces, scaffold erection, structural or temporary works, electrical work, and anything needing a specialist. These need a competent person. Message me first if you're unsure.

