I will do quantity takeoff, material estimation, and bbs for your construction project

Certaines informations sont présentées en anglais.

Pakistan

Je parle Anglais

1 commande terminée

Engineer, Writer, Photographer, Tourist

Hi, I am Zaid Affan, an Urban and Infrastructure Engineer (Civil Engineer) from NED UET Karachi, Pakistan. I am a professional and have 12+ years of experience in building and infrastructure. In s...
À propos de ce service

Are you a contractor, builder, or project owner looking for fast, pinpoint-accurate construction quantity estimates and rebar schedules? Look no further!


With extensive experience using PlanSwift, AutoCAD, and Primavera P6, I provide precise Quantity Takeoffs (QTO), Bill of Quantities (BOQ), and Bar Bending Schedules (BBS) that keep your project on budget and save you thousands in material waste.


---


What I Offer:


1. **Structural & Architectural Quantity Takeoff**

  * Concrete, Formwork, Masonry, and Finishes

  * Excavation, Backfill, and Foundation Work


2. **Detailed Bar Bending Schedule (BBS)**

  * Bar Mark, Shape Code, and Diameter (mm/inch)

  * Cutting Lengths, Hook Allowance, & Overlap Calculations

  * Rebar Summary by Diameter (Tonnage / Weight in kg or lbs)

  * Steel Wastage Optimization (keeps scrap to a minimum!)


3. **Bill of Quantities (BOQ)**

  * Formatted Excel sheets.


Why Hire Me?

* **Marked-Up Drawings Provided:** Clear PDF color-coded markups so you can verify every number.

* **Zero Guesswork:** Explicit assumption log for any missing detail on drawings.

* **Software Expertise:** PlanSwift, MS Excel, AutoCAD, MS Project/Primavera P6.

Taille du projet:

Complexe de bâtiments

Type de bâtiment:

Résidentiel

•

Commercial

Matériaux spécialisés:

Béton

•

Acier

Préférence du type de livraison

Veuillez informer le freelance de toute préférence ou préoccupation concernant l'utilisation d'outils d'IA dans la réalisation et/ou la livraison de votre commande.

Mon portfolio